The Spice Lounge
 

離島醫院地下鋼立柱工程 / Islands Health Care Complex king post works



清理地下石塊 地下鋼立柱施工 (最大單日入土鋼立柱長度1248直米) / clear up underground stone block and Underground steel column construction works (Maximum single-day steel column length 1248 meters)