The Spice Lounge
 

亞利雅架圓形地泵房建造工程 / Construcao Da Nova Estacao Elevatoria Residual



開挖, 椿承台建造, 4層支撐, 工字樑 , 臨時水電 及 上蓋連機電工程 / Excavation, piling, supporting, temporary electricity power construction works and Structure of the main structure with MEP